The city of Somerset has recently installed Compressed Natural Gas (CNG) fueling capabilities. Currently CNG prices range from $1.50 to $2.00 gasoline gallon equivalent. This will result in considerable cost savings for the city. The facility is located at the city’s refueling station on Chapel Dairy Road. The University of Kentucky Center for Applied Energy Research's Eastern Kentucky regional representative, Greg Copley, was on hand to observe a CNG powered Freightliner dump truck being refueled.

The dedicated fuel truck was in route from South Carolina to a truck show in Peoria, Illinois when the driver determined he needed to fuel up before making it to Louisville. He contacted the Somerset facility manager who agreed to sell enough CNG for the truck to get to Louisville.

One noticeable attribute of this type of vehicle is the lack of noise from the engine as it started and drove down the road. According to the driver, the truck has an automatic transmission and the truck seemed to handle hills well. Since this was the driver’s first experience driving this vehicle, its performance is still unknown at this point. There are four CNG tanks that can be operated separately or together to run the vehicle.